Analysis And Implementation Of Productivity Improvement In Cylinder Head Rough Machining

Authors

  • Manoj kumar M
  • Dr.S.Arunprasad
  • Prabhu V
  • Dr. U.Tamilarasan
  • elmurugan
  • Karthikeyan K

Keywords:

Bar graph, breakdown, cycle time, cylinder head,drilling cycle, pareto chart, productivity, target time

Abstract

The cylinder head rough machining unit at Chennai plant continues to face the challenges of improving productivity. It is important to provide the desired quantity to the end consumer by improving the efficiency of the plant. The company has a production capacity of almost 142 components per day. This capacity cannot be produced due to various losses. The study aimed at identifying the root cause of these losses and to propose methods to increase the productivity.Pareto chart and bar graph are used to plot various factors that affect productivity. This project mainly focuses on reasons for breakdown, partrejection and high cycle time, which is a threat to the organization. In order to improve the productivityof the organization, the most severe cause is identified which is the high cycle time of the process. Then it is studied in detail and found that among 15 operations, the operation 85 (Bolt hole drilling) exceeds the target time. On observing the split-uptime of operation 85, it is found that the time taken by the drilling cycle is high. Hence it was suggested to increase the feed (m/min) of the tool in order to increase the productivity. Thus, a better system was proposed and implemented in the organization under study.

Downloads

Published

2023-12-21

How to Cite

Manoj kumar M, Dr.S.Arunprasad, Prabhu V, Dr. U.Tamilarasan, elmurugan, & Karthikeyan K. (2023). Analysis And Implementation Of Productivity Improvement In Cylinder Head Rough Machining. Elementary Education Online, 19(4), 6869–6906. Retrieved from https://ilkogretim-online.org/index.php/pub/article/view/5607

Issue

Section

Articles

Most read articles by the same author(s)